Unique Composite bathroom pod that provides a single one-piece structure
Calculate the PriceUnique Composite bathroom pod that provides a single one-piece structure
Calculate the PriceSteel bathroom pods - a uniqueway to achieve build quality and freedom of design
Calculate the PriceSteel bathroom pods - a uniqueway to achieve build quality and freedom of design
Calculate the PriceGet in touch with our expert team to start the creation of your bespoke bathroom pod
Calculate the PriceGet in touch with our expert team to start the creation of your bespoke bathroom pod
Calculate the Price
Some writing regaring your offerings.
Info about parties you have suplied temnts to.
All the info about the wedding si of thingsa















This project is the first contract for Moon new enhanced and floorless GRP pods.
The bathrooms and shower rooms are being manufactured and fitted out offsite and installed on each floor as the building structure rises upwards. This solution reduces the build programme and the number of trades required on site and enhances quality.










Moon has manufactured 44 steel-framed bathroom pods for the project - our first timber-framed residential development.
The bathrooms and shower rooms are being manufactured and fitted out offsite and installed on each floor as the building structure rises upwards. This solution reduces the build programme and the number of trades required on site and enhances quality.










The hotel owners specified two pod designs from our extensive library of bathroom solutions. This significantly reduced design time and facilitated production.
The bathrooms for the superior double bedrooms have large format grey porcelain tiles, a wall-mounted basin with granite shelf, LED lighting, and a bath with overhead rainfall and hand-held thermostatic showers.












This prestigious waterside development was the first application of our new steel and concrete pods, which provide a fully waterproofed solution for luxury wet rooms and bathrooms.
We supplied 443 pods for 327 private rental apartments for the iconic 35-storey tower and the adjacent six-storey building. These were a combination of wet rooms and bathrooms












This project is the first contract for Moon new enhanced and floorless GRP pods.
The bathrooms and shower rooms are being manufactured and fitted out offsite and installed on each floor as the building structure rises upwards. This solution reduces the build programme and the number of trades required on site and enhances quality.








Moon has manufactured 44 steel-framed bathroom pods for the project - our first timber-framed residential development.
The bathrooms and shower rooms are being manufactured and fitted out offsite and installed on each floor as the building structure rises upwards. This solution reduces the build programme and the number of trades required on site and enhances quality.










The hotel owners specified two pod designs from our extensive library of bathroom solutions. This significantly reduced design time and facilitated production.
The bathrooms for the superior double bedrooms have large format grey porcelain tiles, a wall-mounted basin with granite shelf, LED lighting, and a bath with overhead rainfall and hand-held thermostatic showers.












This prestigious waterside development was the first application of our new steel and concrete pods, which provide a fully waterproofed solution for luxury wet rooms and bathrooms.
We supplied 443 pods for 327 private rental apartments for the iconic 35-storey tower and the adjacent six-storey building. These were a combination of wet rooms and bathrooms